Completed
 
 
 
 
 
Fundraise
Digital
Eckhoff Steel Bridge Team Giving Page - fund change
Advancement Website → Requests
Due Open Deliverables
  / 1
Project Lead Project Team
not assigned not assigned
Sponsor Information
EngineeringNicholas ColeDirector of Development
Project Description
See attached website request(s)
Deliverables
Request TypeDue DateStatusAssigned TeamRequested Updates 
Fund - Update fund page contentCompleteMonica Vosilla

Please add the following text above the existing fund page text:

 

"Thank you for your support of the University of Florida Eckhoff Steel Bridge Team. Gifts made here support the team's endowment fund. If you are a sponsor, or want to support the team's operations this year, please search for the team's spendable fund under number 007808 in using the above search function. For questions, please contact Nicholas Cole, Director of Development for the Engineering School of Sustainable Infrastructure and Environment (n.cole@ufl.edu)."

🔎 ✏️
Propose a new pageCompleteMonica Vosilla

Please add a giving page for this spendable fund: Eckhoff Bridge Program Fund 007808

Please use the following original text (currently on the Endowed Fund page), and add the additional details below:

https://www.uff.ufl.edu/giving-opportunities/007807-william-and-linda-eckhoff-bridge-program-fund/

 

This fund was established by William and Linda Eckhoff in 1999 to support the Steel Bridge Program in civil engineering.

William founded Central Bridge Company in Columbia, MO and Gulf Coast Developers in 1998. During his career in the construction business, he amassed 10 companies. When he retired, William sold all the companies and moved to Punta Gorda.

William and Linda have eight children.

 

About the UF Eckhoff Steel Bridge Team:

Since 1992, the University of Florida has competed with 250 other universities for the national title. In the past 30 years of competition, our team has made 23 national competition appearances, including 20 top ten finishes and four national championships.

Design: The team spends over 1,000 hours each season de-signing thousands of different bridge models. Six different models, each with multiple iterations, are tested before finalizing the competition design. Sev-eral optimization tools are used throughout the de-sign process including AutoCAD, genetic algorithms, and structural analysis / finite element analysis pro-grams such as Solidworks and Visual Analysis.

Fabrication: A team of over 20 students gain valuable hands-on experience, dedicating close to 2,000 hours on the fabrication of the bridge. The entire fabrication of the bridge is completed at the University of Florida, where students learn to precisely cut, mill, and weld steel sections.

Assembly: Prior to the regional and national steel bridge competitions, the team dedicates more than 500 hours to practicing the assembly of the bridge. Based on the concept of Accelerated Bridge Construction, the team determines the fastest and most efficient way to put the bridge together.

The Competition:

Each year, the American Institute of Steel Con-struction invites students to put their classroom knowledge to the test in an annual Student Steel Bridge Competition. From conception and design to fabrication and construction, students are given the unique opportunity to take part in a project from start to finish.

The final product, a 20-foot long steel bridge, must be able to support 2,500 pounds of vertical load and be assembled quickly in timed competi-tion. The team is scored in two main categories: construction economy and structural efficiency, which together give a team its aggregate score. As with a real-world construction application, teams must maximize efficiency by taking careful consid-eration into weight, deflection, and construction time, all of which contribute to an overall cost. The team with the lowest overall cost wins the competition.

In the past 28 years of competition, the University of Florida Team has continuously demonstrated its ability to optimize steel bridge structures with 23 national competition appearances, 20 top-ten finishes, and 4 national championships. It is with the same pride and dedication which we aim to build upon our team’s legacy.

🔎 ✏️

WEBSITE REQUEST

Created on Nov. 21, 2022 at  2:50 PM (EST). Last updated by Jason Phenicie on Dec.  7, 2022 at  6:32 AM (EST). Owned by Anonymous.
Anonymous
Jason Phenicie
Show fields from Show fields from Show fields from a related table
Report Name *
Description
Reports and Charts Panel
Each table has a panel listing its reports and charts, organized in groups.
Please wait while your new report is saved...
Field label
Column heading override
Justification
What does auto mean?
Fields in:

Fields to Extract:

Name for the new table:
Items in the new table are called:

When you bring additional fields into a conversion, Quickbase often finds inconsistencies. For example, say you're converting your Companies column into its own table. One company, Acme Corporation, has offices in New York, Dallas and Portland. So, when you add the City column to the conversion, Quickbase finds three different locations for Acme. A single value in the column you're converting can only match one value in any additional field. Quickbase needs you to clean up the extra cities before it can create your new table. To do so, you have one of two choices:

  • If you want to create three separate Acme records (Acme-New York, Acme-Dallas and Acme-Portland) click the Conform link at the top of the column.
  • If the dissimilar entries are mistakes (say Acme only has one office in New York and the other locations are data-entry errors) go back into your table and correct the inconsistencies—in this case, changing all locations to New York. Then try the conversion again.

Read more about converting a column into a table.

We're glad you're interested in doing more with Quickbase!

Now we need to make you official before you share apps or manage your account.

Verifying your email lets you share Quickbase with others in your company.

Your work email
Your company